Rural Municipality of Gimli Water Reservoir and Pumping Station

Opportunity Information

Organization: The Manitoba Water Services Board

Organization Address: Unit 1A - 2010 Currie Blvd. Brandon, MB R7B 4E7

Reference Number: MWSB 1386

Solicitation Type: Tender for Public Opening

Posting (MM/dd/yyyy): 06/23/2017

Closing (MM/dd/yyyy): 07/14/2017 before 11:00 a.m. prevailing Brandon time

Last Update (MM/dd/yyyy): 06/23/2017

Bid Information

Project Description:

Construction of a new reinforced concrete reservoir, water treatment plant and related work including mechanisation of two wells and connections to existing water infrastructure.

Test Hole/Site Visit Meeting:

The Engineer will be available at the following date and time to provide Bidders with access to the
Work Site for viewing: Wednesday. July 5, 2017 @ 10:00 a.m.
Although the Work Site viewing is not mandatory, the MWSB suggests Bidders view the Work Site.
Bidders are not entitled to rely on information received from the Engineer or other third parties at the site viewing unless MWSB has provided the information in writing in the form
of an addendum.
Test Hole Digs
Test hole dig will be done during site visit July 5, 2017 at 10:00 am.

Tendering Authority Contact Information:

Robin Lytle
Construction Manager
Unit 1A - 2010 Currie Blvd.
Brandon, MB R7B 4E7
Tel: 204-726-6096
Fax: 204-726-6290
Email: robin.lytle@gov.mb.ca

Opportunity Notices

This notice is provided for information purposes only. Refer to the "Opportunity Documents" in the bid package for authoritative information.

All queries pertaining to the language, content or any missing or inaccurate information within this abstract must be sent to its originator of the abstract, as specified in the opportunity notice.

� MWSB - All rights reserved. No part of the information contained in this Web Site may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior written permission of the Construction Manager, via: robin.lytle@gov.mb.caThe Manitoba Water Services Board is not responsible or liable for the accuracy of the information contained in the publication. It is the responsibility of interested parties to review the opportunity posting for changes or updates prior to the opportunity closing date/time.